Daniel Formoso
President,
TDX Construction Services

3601 C Street, Suite 1000-21
Anchorage, AK 99503

danielf@tdxcorp.com
(907) 762-8430

NAICS CODES

237990
236210
236220
332311
561210

FEATURED PROJECTS

  • 6th Floor SCIF Renovation for GSA

    6th Floor SCIF Renovation for GSA

    Washington DC

    Project Facts

    Completed July 2016
    $4,886,628.20
    33,000 SF

    Owner

    General Services Administration, FBI

    Delivery Method

    Design-Bid-Build

    Project Description

    Design-Build renovation of 33,000 SF within an occupied, high-security building in downtown Washington DC, including demolition, removal and installation of new HVAC, plumbing and electrical systems.

  • Storm Sewer CIPP Lining at McGuire Air Force Base

    Storm Sewer CIPP Lining at McGuire Air Force Base

    Joint Base McGuire-Dix-Lakehurst

    Project Facts

    Completed June 2016
    $2,094,244
    Contractor successfully fabricated 120″ pipe to fit the project

    Owner

    U.S. Army Corps of Engineers, Philadelphia District

    Delivery Method

    Design-Bid-Build

    Project Description

    Construct Cured In-Place Pipe (CIPP) Under Airfield, including 321.5 feet of 120-inch diameter corrugated metal pipe under parking apron at McGuire Air Force Base on Joint Base McGuire-Dix-Lakehurst.

  • Repair 514th SFS Facility, Building 1738 at Joint Base McGuire-Dix-Lakehurst

    Repair 514th SFS Facility, Building 1738 at Joint Base McGuire-Dix-Lakehurst

    Joint Base McGuire-Dix-Lakehurst

    Project Facts

    Completed August 2016
    $2,863,692.00

    Owner

    U.S. Army Corps of Engineers, Philadelphia District

    Delivery Method

    Design-Bid-Build

    Project Description

    Demolish and replace interior walls, ceilings, doors and flooring. Also, replace all mechanical, electrical, and telecom systems.

  • Construction of Special Warfare Modular SCIF (Grace Hopper Building)

    Construction of Special Warfare Modular SCIF (Grace Hopper Building)

    Coronado Naval Facility, San Diego, CA

    Project Facts

    Completed June 2016
    $763,351.00
    “Fast track” with all construction in compliance with IDC 705 standards to provide accredited SCIF

    Owner

    NAVFAC

    Delivery Method

    Design-Build

    Project Description

    Design-Build renovation of existing rooms inside an occupied high-security building on Coronado Naval Facility in San Diego, California. Work included demolition, removal and installation of new HVAC, electrical, and plumbing systems.

  • Construction of APS Pre-Engineered Building at McGuire AFB

    Construction of APS Pre-Engineered Building at McGuire AFB

    McGuire AFB, NJ

    Project Facts

    Completed October 2016
    $1,500,000.00
    New Construction

    Owner

    U.S. Army Corps of Engineers, Philadelphia District

    Delivery Method

    Design-Bid-Build

    Project Description

    Construction of two pre-engineered buildings (PEBs) on McGuire AFB.

    Mobile Emergency Operations Center PEB – drive-through, high-bay garage.

    Aerial Port Squadron PEB – 2000 SF warehouse.

  • Repair and Replace Sanitary Sewer at Lakehurst Naval Air Station

    Repair and Replace Sanitary Sewer at Lakehurst Naval Air Station

    Lakehurst Naval Air Station, NJ

    Project Facts

    Completed June 2017
    $2,985,677.00
    5,500 LF of sanitary piping

    Owner

    U.S. Army Corps of Engineers, Philadelphia District

    Delivery Method

    Design-Bid-Build

    Project Description

    Project consisted of repairs to selected sanitary sewer lift stations (pump stations), sewer mains, sewer laterals and manhole structures at Lakehurst Naval Air Station.